13310583_1137839122913525_8200237808557791381_n13315280_1137839146246856_8372803878629024780_n13342921_1137839096246861_4268633621936781645_n13770325_1178476778849759_851432753934753082_n13891948_1178476465516457_9056710885066924982_n13900300_1178476468849790_1477296240017754216_n13901399_1178476518849785_4554735006964586213_n13912827_1178476645516439_6961684129928474070_nhotel

Collins Park Hotel

Our Price:

Project Overview: ASAP Installations installed over 1,200 linear feet of stay-in-place steel sheet piling and pre-drilled approximately 625 linear feet of drive line due to the hard soil conditions.  All of this work occurred within a historic site that contained fragile facades to be integrated into the new structure.

The project was a success due to the patented technology incorporated into the ASAP Sheetpiler, which allowed us to provide a speedy installation while protecting the historic facades from damaging vibrations.

Additionally, there were many logistical challenges presented due to the urban construction site that were seamlessly worked through with the General Contractor.

Client: The Rinaldi Group

Owner: Chetrit Group

Location: Miami Beach, Florida

Year(s): 2016

Critical success factors were: Unique capabilities of the ASAP Sheetpiler and teamwork with the general contractor.