CW-Roberts-Eglin-AFB-Range-Road-4-90×90CW-Roberts-Eglin-AFB-Range-Road-9-90×90CW-Roberts-Eglin-AFB-Range-Road-8-90×90CW-Roberts-Eglin-AFB-Range-Road-7-90×90CW-Roberts-Eglin-AFB-Range-Road-6-90×90CW-Roberts-Eglin-AFB-Range-Road-5-90×90CW-Roberts-Eglin-AFB-Range-Road-3-90×90CW-Roberts-Eglin-AFB-Range-Road-2-90×90CW-Roberts-Eglin-AFB-Range-Road-1-90×90

Eglin Air Force Base Range Road Reconstruction

Our Price:

Project Overview: ASAP Installations installed nearly nine miles of permanent steel sheet piling, including 120 pairs in one day with our ASAP Sheetpiler, for the protection of Range Road on Eglin AFB. During the course of the project, there were up to three sheetpilers working simultaneously to maintain a very tight project schedule.

The project was a huge success due to the teamwork displayed by the general contractor, C.W. Roberts, and our team, and the fast-paced installation of the ASAP Sheetpiler.

Client: CW Roberts Contracting

Owner: U.S. Army Corps of Engineers

Location: Santa Rosa, Florida

Year(s): 2009-2010

Critical success factors were: Teamwork with the general contractor and productivity capability of the ASAP Sheetpiler.